If your scheme does not involve cost recovery, because it is a totally self developed/self contained scheme then the decision could be made to install a system which only provides sufficent information to monitor the energy consumed but does not require "revenue grade" metering. It may be that the choice is made to only install metering for monitoring purposes, becuase energy costs are apportioned on a floor area or unit (dwelling) basis, however schemes being developed using this approach are becoming increasingly rarer as it gives little incentive to the end consumer if their energy bill is not linked directly to usage. For the energy generation plant itself, it is good practice, and typically a requirement under legislation such a the CHPQA program to install an energy input and output meter wherever practically possible for each piece for plant, i.e. a CHP unit or boiler. By continous monitoring of these meters an energy balance for the plant can be obtained and deviations in efficiency compared to design levels can be quickly idientified and then rectified. Typically there are two choices for linking the energy meters across a district energy network. The first is to link the meters to the LAN used for the building automation system controlling the plant in the energy centre. This is normally achieved by inputting pulses from the meters into the LAN (for each tranchce of kWh or MWh passing through the meter), which can then be read remotely at the energy centre. Alternatively a seperate metering network (an MBuS) can be installed, particularly to retain the integrity/robustness of the metering system and return a greater amount of information from the meters (on temperatures, flow rates etc...) to the cental energy centre.
|
Who's Online
We have 64 guests onlineNon-Governmental Decentralised Energy Press Releases Updated Daily
- 31/08/10 - Turbine foundations installed at Greater Gabbard
- 25/08/10 - Offshore wind sector set to create 60 times more jobs in ten years
- 24/08/10 - £2.5M green energy scheme reaches new milestone, as first site takes shape
- 23/08/10 - Wave Hub cable floated ashore at Hayle
- 23/08/10 - Huge drop in solar thermal sales since new Government - Solar Trade Association survey reports dramatic drops
- 19/08/10 - Quercia partners with ENER-G to turn greenhouse gas into energy
- 17/08/10 - ScottishPower Renewables Welcomes Hammerfest Strøm's Commitment to the Scottish Reneweble Energy Sector
- 16/08/10 - World's most powerful tidal stream turbine passes another milestone: two million kWh delivered
- 13/08/10 - Atlantis Unveils The World's Largest Tidal Turbine - The AK1000
- 13/08/10 - Corus unveils plans to make wind tower components on Teesside
- 02/08/10 - Wales: ‘Tescoisation’ of wood market by energy plants must not negatively impact on other wood-using businesses – Assembly committee hears
- 29/07/10 - Minister announces further investment in marine renewables during Wave Hub visit
- 20/07/10 - Air Products announces plans for renewable energy plant in Tees Valley
- 19/07/10 - Wave Hub and cable prepared for subsea installation
- 16/07/10 - Scotland secures renewable energy agreement
Most Viewed Items This Week
- Southampton Geothermal
- Public Sector Organisations Concession Rate
- Conference Payments for Standard Delegates
- Property and Housing Developers Concession Rate
- Standard Delegate Rate
- Delegate rates and concessions
- Current Events
- Hydro, Wave & Tidal Power
- Degree Days
- CHP
- Conversion Charts
- Electricity Networks






When building a decentralised energy scheme it is important to consider a metering strategy from the outset. Metering serves two purposes, the first is energy monitoring and the second is consumer billing/cost recovery.